Introduction
To some extent, many organizations, if not all, suffer from some form of performance deviation.
This can manifest itself in any goal or standard against which organizations may measure themselves.
Such failures are usually due to organizational systems shortcomings or human action.
Generally, in aviation prior to World War II, most accidents were attributable to mechanical (system) failure.
During WWII manufacturing, technology and design
improved such that more accidents became attributable to pilot (human)
error than to mechanical failure.
To counter this, human factors were incorporated
into airplane design, and standard operating procedures were developed
for crews, garnering some improvement.
In 1980, the adaptation of crew/cockpit resource
management aligned systems which helped greatly, making air travel safer
than most other modes of transportation.
Deviating Standards of Performance
I attended a conference not long ago where Mike Mullane, a former astronaut, was the keynote speaker.
Mullane spoke of leadership and performance standards.
He used examples from his time in NASA, but his
message is equally applicable to any industry, especially the
construction industry.
The point of his talk was the "normalization of deviance."
This concept was developed by Diane Vaughan in her exceptional study of the space shuttle Challenger accident.
Mullane stressed the need to guard against the insidious effect of this concept.
Normalization of deviance is a phenomenon by which
individuals, groups or organizations come to accept a lower standard of
performance until that lower standard becomes the "norm" for them.
This phenomenon usually occurs when individuals,
groups or organizations are under pressure to meet schedule
requirements, conform to budgetary considerations or deliver on a
promise, while adhering to expected standards or prescribed procedures.
Faced with a situation in which relaxing the standards
or procedures gets the "job done," they decide to utilize lower
standards or less robust procedures with the expectation that when
things get back to "normal," they will go back to utilizing the higher
standards or procedures.
Generally, the problem is resolved and, to their relief, with no adverse effect.
However, the pressures do not seem to abate, and the lower standard may be used again.
Every time this is done successfully, it becomes easier to do it the next time.
The successful use of the lower standard over time is
perceived as somehow an acceptable substitute for the original standard
and, therefore, becomes the norm or the "new" standard for performance.
As a result, the individual, group or organization stops seeing its action as deviant.
The NASA Example
A classic example of normalization of deviation
involves the two NASA space shuttle accidents involving the Challenger
and the Columbia vehicles.
The Challenger accident was the result of O-ring seal failure.
It is interesting to note that four different vehicles flew 24 missions before the Challenger accident.
NASA found indication of O-ring malfunctioning after every flight, with no significant consequences.
As a result, the concern for these deviations and the potential for a disastrous outcome were basically ignored.
The Rogers Commission, set up to investigate this
accident, found that NASA's organizational culture and decision-making
processes had been key contributing factors to the accident.
NASA managers had known that contractor Morton
Thiokol's design of the solid rocket boosters contained a potentially
catastrophic flaw in the O-rings since 1977 but failed to address it
properly.
They also disregarded warnings from engineers about
the dangers posed by launching at the low temperatures of that morning
and failed to adequately report these technical concerns to their
superiors.
Deviations from proper practice became normalized and accepted as the "new" operating practice.
NASA had a major stand-down, implementing some changes
to the vehicles as well as processes, practices and procedures going
forward.
Seventeen years later, another normalization of deviation caused the loss of the Columbia space shuttle.
During the launch of STS-107, its 28th mission, a
piece of foam insulation broke off from the space shuttle external tank
and struck the leading edge of the left wing.
Most previous shuttle launches had seen minor damage
from foam shedding with no serious consequence to the integrity of the
vehicles.
When the shuttle reentered the atmosphere of earth,
the damage allowed hot atmospheric gases to penetrate and destroy the
internal wing structure, which caused the spacecraft to become unstable
and slowly break apart, killing all on board.
After the disaster, space shuttle flight operations
were suspended for more than two years, similar to the aftermath of the
Challenger disaster.
Since the program ended, it is not clear if, after the second disaster, the safety culture at NASA had really changed or not.
Safety cultures evolve gradually over time in response
to local conditions, work pressures, the character of leadership and
the perception of the workforce.
Acceptance of deviations from prescribed standards occurs gradually, affecting the culture in very subtle ways.
Turning to the Construction Industry
Production pressures are common in construction. It is easy to see the normalization of deviance taking root.
If a worker needs to use a stepladder to perform a
task, but one long enough is not readily available, the worker is faced
with a choice to take the time to find a longer one and possibly fail to
meet the production goal or use the shorter one and get the job done.
If the supervisor stresses production goals and the
worker feels that his or her job might be in jeopardy, the logical
choice will be to use the shorter ladder and meet the production goal.
If the worker chooses to bring up the lack of proper
equipment being available for the task, the supervisor is also faced
with a choice of accepting a delay or reduction in production while the
appropriate equipment is secured or asking the worker to make do with
what they have and get the job done.
Underlying this decision is the knowledge that work
has been successfully completed in the past with less-than-optimal
equipment or procedures with little or no adverse effect.
In order to solve the immediate conundrum, the supervisor may ask the worker to proceed anyway but to be extra careful.
The worker does so successfully.
The next day, they still do not have longer ladders, and the worker proceeds working on the top step of the shorter ladder.
After a few days, the worker does not even think about the safety coordinator's admonitions.
Working this way becomes accepted practice, and the deviation becomes normal practice.
The schedule is a powerful driver of production.
When supervisors succeed in overcoming barriers through deviations
from "good" work practices without adverse effects, they reinforce the
use of performance discrepancies and deviant practices.
After repeating this a few times, solving performance pressures by
deviation becomes institutionalized, forming a culture of production,
which leads to acceptance of deviations from good work practices.
Therefore, the reasons for a future failure conforms to accepted
deviant practices, and the prevailing unsafe work culture rather than
the violation of the original "good" performance standards.
Examples and Explanations
In work situations, a manager makes a wrong judgment
call, a supervisor makes a miscalculation, or a worker takes a risk or
ignores a safety rule, with no major consequence.
Later, another situation arises that can be resolved
with the same improper approach, and eventually it becomes easy to
repeat the improper action because it seems to work and solves the
immediate problem.
That approach becomes the accepted way to deal with similar situations going forward.
Not only is the deviation normalized, but it becomes the "new" normal and the accepted way to do things.
Following are a few examples of reasons why there are
normal deviations from standard practices in organizations: When
achieving production goals is stressed and safety rules ignored, workers
come to believe that how they are going about doing their jobs is in
fact in the organization's best interest.
This justification of deviation reinforces the
perception that safety rules are counterproductive and breaking them is
actually beneficial.
Depending on the work climate or the perception of the
workers of expectations and consequences, they may be afraid to speak
up or point out barriers to performance, such as unreasonable
expectations, insufficient time, deficient resources, or any other
impediment to getting the job done.
This leads to deviation from standards using inappropriate behavior.
Repeated success increases the likelihood that rules will be violated and will eventually become normalized.
Changing the Culture
Reversing the normalization of deviance is difficult unless there is a structural change in the organization.
This is not easy to do, as it is the culture and work
climate that allows these deviations to occur and become accepted.
According to James Reason, a poor safety culture has three overriding
factors:
1. Normalization of deviance is discussed at length above.
2. Complacency results in accepting risk or underestimating the exposure of the act due to past experience.
Complacency turns people into observers or passive participants rather than actively contributing stakeholders.
3. Tolerance of inadequate systems has numerous
fundamental cultural, leadership and organizational causes, which will
be addressed in a future article.
Conclusion
Organizations generally have an expected "conduct of operations."
This is how they would ideally want to operate.
This may involve meeting or beating the project
schedule and/or budget, operating at a high level of efficiency, meeting
or exceeding expectations, treating partners fairly and operating
ethically while being profitable.
In short, "conduct of operations" represents a system
of policies, practices and procedures that ensure requirements are being
met.
Unfortunately, no organization is immune to the
normalization of deviance, regardless of how robust its conduct of
operations system may be.
People erroneously come to believe that a minor
departure from defined procedures is acceptable, when in fact they have
started down the road that eventually will result in some sort of
catastrophe.